|
|
|
 |
|
- Types : D2 D4 D5 D6
- We ensure: the design and manufacturing* of cam sets or a cam within a lead time of 1 to 3 days.
- We provide: diagram layout (production calculation, speeds to be used etc.), the tool layout sheet.
- Tooling: we also provide all of the necessary tooling (tools, collets, guide bush, etc.) within a lead time of one week.
|
|
Provincial Cames is a supplier to several European distributors.
> inquires
|
|
|